Remember: In Abu Dhabi, the specification is king. Part 2 is its constitution. Engineer your work accordingly.
Low-VOC (Volatile Organic Compound) paints, sealants, adhesives, and coatings to preserve indoor air quality during the fit-out phases.
Under Abu Dhabi Road Structures Design Guidelines , pile capacities cannot be evaluated purely on theoretical soil parameters; real-world destructive and non-destructive trial load tests are mandated. 2. Concrete Structures & Prestressing (Chapters 21 & 22)
Responsible for standards and technical guidelines.
Navigating the complexities of Abu Dhabi's SCS Part 2 requires proactive management to avoid costly project delays, structural non-conformances, or municipal penalties. standard construction specifications part 2 abu dhabi
: Materials and installation standards for pipes, manholes, and gullies. Utilities (General)
: Standards for the installation of telecommunications conduits (e.g., PVC telephone ducts) and other infrastructure services. Stormwater Drainage
Provides specifications for drainage systems, including sewerage and drainage pipes (e.g., HDPE pressure pipelines) and access chambers.
While Part 1 focuses on general road works and administrative scope, Part 2 contains the detailed specifications required for specific construction items, particularly for materials and equipment . It is governed by the Abu Dhabi Quality and Conformity Council (QCC) and is often bundled into technical drawing guidelines like TR-541 (Part 2) TAMM - Abu Dhabi Government Services Key Technical Sections Part 2 typically includes comprehensive sections on: STANDARD CONSTRUCTION SPECIFICATIONS - Sign In Remember: In Abu Dhabi, the specification is king
| | Source | Acceptance Criteria | |------------------|------------|--------------------------| | Selected fill | Borrow pit (approved quarry, e.g., Al Ain or Sweihan) | Max particle size 75 mm, ≤ 5% fines passing #200, sulfate content ≤ 0.5% by weight | | Granular sub-base | Same | CBR ≥ 30, sand equivalent ≥ 35, liquid limit ≤ 25, plasticity index ≤ 6 | | Structural fill | On-site or imported | No organic matter, no gypsum bands, chloride ≤ 0.3% (for reinforced zone) | | Fill behind retaining walls | Free-draining granular material | ≤ 12% passing #200 sieve |
To ensure you have the most up-to-date information for your project, Abu Dhabi Standard Construction Specs | PDF - Scribd
Abu Dhabi’s construction sector operates under a unified standard designed to eliminate ambiguities between different municipal jurisdictions (Abu Dhabi City, Al Ain, and Al Dhafra). Eliminating Project Discrepancies
Chillers, Air Handling Units (AHUs), and ductwork specifications optimized for high ambient temperatures ( 46∘C46 raised to the composed with power C 50∘C50 raised to the composed with power C ambient design limits). Concrete Structures & Prestressing (Chapters 21 & 22)
Contractors must collaborate with Abu Dhabi-accredited independent laboratories to conduct routine field tests, including concrete cube crushing, asphalt coring, and nuclear density gauge testing for soil compaction.
: Improved ground must have a California Bearing Ratio (CBR) of at least 10% at 5mm penetration. Compliance and Application
Deep foundations must counteract the high water table and sabkha (saline mudflat) soils common to the Arabian Gulf region.
This typically refers to the , published by the Abu Dhabi Department of Municipalities and Transport (DMT) , formerly DoT (Department of Transport). Part 2 generally covers Civil Engineering Works (Earthworks, Pavements, Utilities, Drainage, etc.), distinct from Part 1 (General Requirements) and Part 3 (Building/Architectural).