Design Calculation Example Link !new!: Tower Crane Foundation
This public link is valid for 7 days and shares a thread, including any personal information you added. This link or copies made by others cannot be deleted. If you share with third parties, their policies apply. Can’t copy the link right now. Try again later.
): The shear force resulting from wind acting on the crane structure and the dynamic movement of the crane. Overturning Moment (
This is a comprehensive guide and a fully worked example for the design of a Tower Crane Foundation (Gravity Base/Raft Foundation). tower crane foundation design calculation example link
is the friction angle between the concrete base and the soil. The FoS must be greater than 1.5. Step 5: Concrete Structural Design
The pressure exerted on the ground must not exceed the safe allowable bearing capacity ( qallq sub a l l end-sub This public link is valid for 7 days
σmax=V+WpadB×L+6MB2×Lsigma sub m a x end-sub equals the fraction with numerator cap V plus cap W sub p a d end-sub and denominator cap B cross cap L end-fraction plus the fraction with numerator 6 cap M and denominator cap B squared cross cap L end-fraction Wpadcap W sub p a d end-sub is the self-weight of the concrete pad. Ensure Step 3: Stability Against Overturning
Calculated qmax=241.3 kPaCalculated q sub m a x end-sub equals 241.3 kPa Can’t copy the link right now
Lever arm (distance between two bolt rows) = 1 m. Tension force per bolt pair = 4,500 / 1 = 4,500 kN / pair. Per bolt = 2,250 kN. This is too high – thus, increase bolt size or embedment.